[Poster Presentation]Switching from Local CGTGs to Grid Power for offshore Oilfield Via 100km, 115kv, 90MW submarine cable:Study Case

Switching from Local CGTGs to Grid Power for offshore Oilfield Via 100km, 115kv, 90MW submarine cable:Study Case
ID:200 Submission ID:9 View Protection:ATTENDEE Updated Time:2021-12-03 10:46:59 Hits:616 Poster Presentation

Start Time:2021-12-17 14:30 (Asia/Shanghai)

Duration:5min

Session:[Z] Poster Session » [Z3] Poster Session 3: Power system and automation

Video No Permission Presentation File

Tips: The file permissions under this presentation are only for participants. You have not logged in yet and cannot view it temporarily.

Abstract
High Voltage Alternating Current (HVAC) submarine cables are used to connect large offshore facilities to the onshore power grid leading to the removal of old, inefficient and polluting local power generators. Several issues have to be identified and addressed in the HVAC system design. These issues include reactive power compensation, switching equipment limits, and insulation coordination. The paper present example of 100km, 115kV HVAC submarine cable that used to transfer 90MW from onshore power grid to offshore Gas Oil separation Plant (GOSP) and the decommission of old Combustible Gas Turbine Generators (CGTGs).
Keywords
submarine cable,HVAC,Offshore oilfield
Speaker
Hassan Bekhit
Saudi Aramco

Submission Author
Hassan Bekhit Saudi Aramco
Comment submit
Verification code Change another
All comments
Contact Us:
Southwest Jiaotong University(SWJTU)
Add: No.999, Xi'an Road, Pidu District, Chengdu City, Sichuan Province,611756 China
Email: ciycee2021@163.com

 

WeChat public account:

IEEE IAS SWJTU学生分会

WeChatgroup: 

CIYCEE2021 

CIYCEE官方微信群:CIYCEE2021