[Oral Presentation]Statistical Analysis of Heavy-load Transformers in Zhejiang Power Grid during Summer

Statistical Analysis of Heavy-load Transformers in Zhejiang Power Grid during Summer
ID:189 Submission ID:60 View Protection:ATTENDEE Updated Time:2021-12-03 10:46:01 Hits:520 Oral Presentation

Start Time:2021-12-16 10:45 (Asia/Shanghai)

Duration:15min

Session:[H] Other topics in Electrical Engineering » [H2] Session 24

Video No Permission Presentation File Attachment File

Tips: The file permissions under this presentation are only for participants. You have not logged in yet and cannot view it temporarily.

Abstract
with the continuous rise of summer weather temperature and power load, some transformers operate under heavy load or even overload, which has an impact on the safe and stable operation of power grid. This paper makes statistics on 220 kV and above heavy load transformers (load rate 80% and above) in Zhejiang Province during summer, analyzes the possible causes of transformer heavy load, and puts forward the follow-up operation and maintenance strategy.
Keywords
transformer, heavy load, operation and maintenance strategy
Speaker
Jian He
Zhejiang Electric Power Co.; Ltd. Research Institute

Submission Author
Jian He Zhejiang Electric Power Co., Ltd. Research Institute
Bing Yu Zhejiang Electric Power Co., Ltd. Research Institute
Haofan Lin Zhejiang Electric Power Co., Ltd. Research Institute
Yong Yang Zhejiang Electric Power Co., Ltd. Research Institute
Lin Zhao Zhejiang Electric Power Co., Ltd. Research Institute
Wenzhe Zheng Zhejiang Electric Power Co., Ltd. Research Institute
Comment submit
Verification code Change another
All comments
Contact Us:
Southwest Jiaotong University(SWJTU)
Add: No.999, Xi'an Road, Pidu District, Chengdu City, Sichuan Province,611756 China
Email: ciycee2021@163.com

 

WeChat public account:

IEEE IAS SWJTU学生分会

WeChatgroup: 

CIYCEE2021 

CIYCEE官方微信群:CIYCEE2021