Validation of a Behind-the-meter Battery Control with degradation cost by Hardware Experiments
ID:16
Submission ID:47 View Protection:ATTENDEE
Updated Time:2021-12-10 20:30:25
Hits:656
Oral Presentation

Start Time:2021-12-15 15:00 (Asia/Shanghai)
Duration:15min
Session:[A] Renewable energy system » [A1] Session 1
Video
No Permission
Presentation File
Tips: The file permissions under this presentation are only for participants. You have not logged in yet and cannot view it temporarily.
Abstract
To addresses the voltage issue in the distribution network caused by high PV penetration and the high cost of energy storage systems, a behind-the-meter battery scheduling and control algorithm has been proposed in this paper. The proposed solution includes a control framework that can schedule the day-ahead battery operation and prevent overvoltage in distribution systems. Two different techniques that aim to prolong battery life have been quantified, one is a hardware-based technique that uses a parallel connected supercapacitor to absorb large charging and discharging current; the other is a software-based technique that considers the battery degradation cost as part of the scheduling optimization. The proposed algorithm is evaluated via both the numerical simulation in the IEEE 13-node test feeder and hardware experiments. Based on the experiment results, a long-term system economic analysis has been made.
Keywords
PV penetration, Battery energy storage system, optimal operation, Degradation