Using Memory Alloy Material to Solve the Problem of Ice-covered Sag of Overhead Ground Wire of Transmission Line
ID:144
Submission ID:103 View Protection:ATTENDEE
Updated Time:2021-12-10 23:14:15
Hits:472
Poster Presentation

Start Time:2021-12-17 14:40 (Asia/Shanghai)
Duration:5min
Session:[Z] Poster Session » [Z4] Poster Session 4: High voltage and insulation technology
Video
No Permission
Presentation File
Tips: The file permissions under this presentation are only for participants. You have not logged in yet and cannot view it temporarily.
Abstract
This paper analyzes the hazards of the ice-covered sag of the overhead ground wire of the transmission line, understands and grasps the causes of the excessive grounding sag of the high-voltage power line. To reduce the overhead ground wire ice sag, based on the conductor LGJ - 240/30 type, ground of GJ - 50 type ground of high voltage transmission lines ice sag problem as the research object, using shape memory alloy material temperature deformation characteristics has designed two kinds of overhead ground wire ice sag, using memory alloy temperature of phase transform- ation point of turning force on ground wire, make it keep safe distance between wires, and auxiliary de-icing, automatically. The stress, sag, tension and gravity of the ground wire are calculated with the typical overhead ground wire design, and the memory alloy spring is selected. According to the design scheme, the simulation test is carried out and the feasibility of the design scheme is proved.
Keywords
Design scheme;Simulation test;ice sag;overhead underground;shape memory alloy